Tuesday, May 6, 2008
Thursday, April 24, 2008
ABI Conference 2008- Burj Dubai Tower
The case study on the Burj Dubai towers focuses on the increasing height of buildings around the world, and the competition to be the tallest. Along with this it discusses the problem involved in constructing buildings of such a height, for example the difficulty to vertically pump the thousands of cubic metres of concrete that is required. The Burj Dubai now holds the record for pumping concrete, upto 588metres. The completion height of the building is unknown, but is expected to be above 800 metres, with the higher portion made from a steel frame structure.




Monday, April 21, 2008
Burj Dubai Tower
The finished height of the tower is predicted to be between 800-950 metres, it is been keep secret in attempts to beat other current skyscraper under construction.
The Burj Dubai Tower is due for completion by June 30th 2009.
The structural steel core of the building.
An Giorgio Armani Hotel will occupy the lower 37 fllors. Floors 45 through 108 will have 700 private apartments, while corporate offices and suites will fill most of the remaining fllors. Expected to be a total of 160-189 floors.Source: www.burjdubaiskyscraper.com
Thursday, April 17, 2008
Panel Bracing
Pre-cast concrete panel construction