ABI Conference 2008- Burj Dubai Tower

The case study on the Burj Dubai towers focuses on the increasing height of buildings around the world, and the competition to be the tallest. Along with this it discusses the problem involved in constructing buildings of such a height, for example the difficulty to vertically pump the thousands of cubic metres of concrete that is required. The Burj Dubai now holds the record for pumping concrete, upto 588metres. The completion height of the building is unknown, but is expected to be above 800 metres, with the higher portion made from a steel frame structure.



Monday, April 21, 2008

Burj Dubai Tower

The finished height of the tower is predicted to be between 800-950 metres, it is been keep secret in attempts to beat other current skyscraper under construction.
The Burj Dubai Tower is due for completion by June 30th 2009.
The structural steel core of the building.
An Giorgio Armani Hotel will occupy the lower 37 fllors. Floors 45 through 108 will have 700 private apartments, while corporate offices and suites will fill most of the remaining fllors. Expected to be a total of 160-189 floors.

Source: www.burjdubaiskyscraper.com







Thursday, April 17, 2008

Panel Bracing

It appears that the panels for this building will be load bearing, whereby the rafter will be bolted into the actual panel spaning across to the grey composite columns.

These three panels are not yet tied into the main structure, it is at this stage where stability of the erected panels is critical and as such they must be temporailty braced often using ferrules. The main brace will be bolted into the panel and again into the concrete slab or pier at an acute angle on the ground.
The braces are evenly spaced to ensure uniformity in load bearing, they are usually only designed to take wind loads.

Pre-cast concrete panel construction

This is a commercial builing under construction using pre-cast concrete panels. It is located on Princess Highway (Dandenong Road) in Carnegie. Accoding to the real estate sign above it is going to be a retail showroom, spanning two levels.

As you can see there is very little space to cast the panels onsite, i would assume that they have been made in a specialised factory, delivered to site via truck and lifted into position by a crane.

There are multiple concrete panels inplace to form the back wall, as you can see they are braced together at the edges using plates to support the panels prior to their incorporation into the final structure.