Wednesday, May 7, 2008

Warehouse Under Construction 2

Roof to wall connections, with fly bracing giving additional support between columns.


Ridge connection with extensive haunching braced to 'c' purlins. There is safety mesh supporting the insulation, covered with Kliplok roofing, which you can see stack on the left ready to be fitted. Along with the red pipe, being the fire services.


The end wall panel shows the bracing from beams, which holds the individual smaller panels inplace. Along with the unfinished roof, hence the safety railing bolted to the 'c' purlins.